Trenchless Sewer Pipe Replacement In Point Loma
Details
Client Residential Client
Completed August 2022
Timeframe Same Day Service
Location Point Loma
Replaced 50 feet of old cast iron pipe with new SDR-17 HDPE pipe. The new pipe is of the same diameter as the pipe being replaced. We only had to dig one hole by the sidewalk and we pulled the new pipe through the crawl space to the sidewalk. This was done using a hydraulic ram that pulls a new pipe underground in place of the old one. Doing this saved breaking the ground and trenching.